Broughton-in-Amounderness Primary, Preston
Broughton C of E Primary School dates back to 1824, and was built with high church-like ceilings, our first challenge in dealing with
Dent C of E Primary School, Sedbergh
A small primary school located in the idyllic village of Dent in Sedbergh, Cumbria. To replace the existing oil fuelled heating system with
Lord Street Primary School, Colne
A large traditional two building primary school where a new heating system was required for both buildings, the existing system was tired and
Underfloor Heating with Air Source Heat Pump
Another Underfloor Heating job fully all designed and installed by our fantastic team. The UFH supplied with Air Source Heat Pump and high-efficiency
Lancaster University, Lancaster
Check out out these work in progress BTS shots of #TeamVital upgrading Lancaster University's Plant Rooms... And as always, cracking workmanship from the
Queen Elizabeth Grammar School, Blackburn
Queen Elizabeth Grammar School (QEGs); commercial natural gas boiler house and hot water - plant room and distribution/emitters renewal...
Parkside GGI Academy, Barrow-in-Furness
A 1960’s primary school up in Barrow in Furness, tired and inefficient heating system which was no longer fit for purpose. VHS designed