At Vital, we love to showcase our incredible portfolio of work…
We’ve built our client base from a name nobody had ever heard of to a position where we feel our client base and reputation within the industry are second to none. The ability to work collaboratively with our clients to deliver bespoke and complex solutions sets us aside from our competitors; we treat our clients as we would our own employees – with respect, an honest approach, and always striving for the best outcome.
Queen Elizabeth Grammar School, Blackburn
Queen Elizabeth Grammar School (QEGs); commercial natural gas boiler house and hot water - plant room and distribution/emitters renewal...
Castercliff Primary Academy, Nelson
Castercliff Primary Academy's mission is to ensure that every child is given every opportunity to SHINE, and we share that same ethos when
Hodgson Academy, Poulton-le-Fylde
Hodgson Academy is a coeducational secondary school located in Poulton-le-Fylde, Lancashire. The school had a tired and inefficient heating system that was no
The Whitaker Museum, Rossendale
Vital Heating Solutions overhauled all the mechanical work at The Whitaker Museum in Lancashire... At The Whitaker Museum, we implemented full new heating
Lord Street Primary School, Colne
A large traditional two building primary school where a new heating system was required for both buildings, the existing system was tired and
Lancaster University, Lancaster
Check out out these work-in-progress BTS shots of #TeamVital upgrading several of Lancaster University's Plant Rooms... The team worked tirelessly to produce cracking
Broughton-in-Amounderness Primary, Preston
Broughton C of E Primary School dates back to 1824, and was built with high church-like ceilings, our first challenge in dealing with
Dent C of E Primary School, Sedbergh
A small primary school located in the idyllic village of Dent in Sedbergh, Cumbria. To replace the existing oil fuelled heating system with
Underfloor Heating with Air Source Heat Pump
Another Underfloor Heating job fully all designed and installed by our fantastic team. The UFH supplied with Air Source Heat Pump and high-efficiency
Parkside GGI Academy, Barrow-in-Furness
A 1960’s primary school up in Barrow in Furness, tired and inefficient heating system which was no longer fit for purpose. VHS designed